What to Check Before You Sign Off on a Commercial LED Lighting Upgrade
Helpful content for facility managers and owners
What to Check Before You Sign Off on a Commercial LED Lighting Upgrade
The crew has finished installing the fixtures, and the lights come on. Before you sign off, walk the building with your contractor and see how the lighting works under the conditions your team deals with every day. A warehouse aisle can look fine from the doorway and still be hard to work in once the racks are full.
Bring the agreed scope with you. If something still isn’t working as expected, make sure you know who’s coming back to look at it.
Start with what the upgrade was meant to fix
Pull up the proposal and any approved changes. Go back to the problem that started the project. If people struggled to see what they were inspecting at a workbench, start there. If the scope calls for measured light levels, ask the contractor for the readings and where they were taken. Compare them with the agreed targets.
Walk the spaces the way your team uses them
Stand where people actually work. In a warehouse, look down a stocked aisle and check the areas where people read labels or handle paperwork. In a showroom, look at displays from a customer’s height and check for glare on glossy surfaces. If exterior lighting was part of the job, plan to see it after dark.
At the Cregger Company showroom and warehouse, we planned for two spaces with different lighting needs. That same distinction matters at a walkthrough. A well-lit display doesn’t tell you whether someone can read a label at the back of a rack.
Have someone from your team try the controls
If controls are part of the upgrade, ask the contractor to demonstrate a normal schedule and one exception your staff actually handles. What happens if a delivery arrives after hours? Have your team try the override and see how the lights return to the regular schedule. Where occupancy sensors are installed, walk a typical route and check when the lights respond and whether they stay on long enough for the task.
Write down what is still open
Give each item a location, a description, a person responsible, and a date to check it again. “Loading door 3 goes dark before the last truck is unloaded” gives the team something to investigate. “Adjust lighting” doesn’t. If emergency or exit lighting was in scope, ask the contractor who was responsible for the required checks and where the results are recorded. Keep the sign-off tied to the agreed scope and closeout process.
Leave the maintenance team with what it needs
Put the closeout information somewhere staff can find it after the project team has moved on. Ask for the items that apply to your job:
- Fixture and control information, including any approved substitutions.
- Current settings, schedules, and plain-language instructions for common adjustments.
- Agreed test results, warranties, and the right contact for service.
- The list of remaining items, with owners and follow-up dates.
Before the contractor leaves, have someone from maintenance use the instructions to change a lighting schedule. If they get stuck, fix the instructions while the contractor is still there.