LED Lighting and Controls Across Five Athletic Spaces
Rock Hill Schools wanted to address poor lighting and recurring maintenance in athletic spaces at Northwestern and Rock Hill high schools. The main gyms used 300-watt induction fixtures, while fluorescent fixtures served the mini gyms and Rock Hill’s weight room. Some protective cages hung open and lamps had become dislodged after impacts.
We replaced the existing lighting with 152 Litetronics LED high-bay fixtures across the four gyms and one weight room, plus 16 LED emergency floodlights. The gyms previously averaged approximately 26 foot-candles. The approved photometric design targeted 50 foot-candles in the gyms and 40 in the weight room.
The district used State of South Carolina Job Order Contracting to work directly with our team under a competitively awarded contract. That allowed us to coordinate the scope, fixture selection, installation plan, and schedule together before work began.
The schools asked for the work to happen over fall break to limit disruption. Our team worked October 3–9, 2026, completing installation, controls commissioning, and testing. We showed staff how to operate the system. All five spaces were ready when students returned.
Staff now use wireless switches or the Litetronics LiteSmart app to dim the lights, control fixture groups, and choose scenes for presentations, player introductions, and other activities. The result is lighting that supports more ways to use each space, with LED systems designed to lower energy use and reduce the maintenance demands of the older fixtures.
Planning a Lighting Upgrade?
We Provide Lighting Solutions for Our Customers
If you're planning a lighting upgrade for your facility, talk with our team first about LED lighting for sports stadiums, warehouse retrofits, self-storage facility upgrades, municipal buildings, or other specialized projects.